Termination Report
All operations related to the termination of Site-96 have been finalized. The subsequent report outlines the results of the operation. Agents were extracted from the site immediately following the activation of the termination protocols. A thorough survey of the site check here revealed negligible collateral damage. Ongoing analysis is necessary